Cyber Development Group offers the capability to customize dedicated and secure Tier 3 or Tier 4 data center facilities on a lease or purchase basis. Each data center is customized to the customer’s specific requirements based on the Uptime Institute’s Tier Standardization.
Cyber Development Group offers single-level facilities from 1,000 to 25,000 SF supporting fully-autonomous raised-floor Tier 3 / Tier 4 data center space with separate slab-to-slab demising of all walls.
Cyber Development Group’s world-class data centers offers unsurpassed security, scalability, and engineering support delivering a 99.995% uptime Service Level Agreement (SLA) for High Density [10kw + per rack] data center facilities.
Building Standards
All data centers meet TIA/EIA-942 (Telecommunications Infrastructure Standard for Data Centers) and the Uptime Institute, Inc. specifications for Tier 3 and Tier 4 Data Center facilities
Building structural standards meet NEBS Level 3 compliance for core and shell with additional blast protection coating for all Data Center, NOC, MEP, and related Operations Rooms
Electrical Infrastructure
3(N) Electrical Distribution Matrix supported by three (3) 100% diverse and independent power generation (/transmission) sources (Commonwealth Edison / Peoples Energy, On-Site Natural Gas based Co-Generation, and, On-Site Diesel Fuel based Generation).
2(N) data center electrical service support for Tier 4 implementation with two (2) stand-alone electrical service rooms ("A" / "B") – each with 100% redundant service feeds from a tied COM ED and ON-SITE natural gas-based bus systems (Com Ed "A", On-Site "A", Com Ed "B", On-Site "B")
Each "A" and "B" electrical grid is feeds one (1) 4000 amp service panel for 2(N) data center electrical service capacity supporting up to 150 watts/square foot
Emergency Generations
Four (4) 1750 kW diesel generators providing N+1 emergency generation for each individual "A" and "B" electrical grid systems.
Each electrical grid ("A" and "B") is supported by independent ATS and TVSS systems tied to the main 2(N) electrical service feeds.
48 hour on-site fuel capacity / 10 day on-campus fuel capacity
UPS Systems
Four (4) 1.6 MW APC InfraStruXure™ Megawatt Systems providing 2(N+1) UPS capacity with 15 minutes of run-time at 70% load
Cooling Systems
Four (4) 390 ton chilled water distribution systems 2(N+1) cooling capacity
Two (2) separate looped systems provide 2N chilled water distribution
On-Site Facility Security
The facility has 24 hour access for customers via a keypad and biometric security system that is independently monitored.
Video Surveillance & Electronic Motion Sensors – Our surveillance systems provide continuous and comprehensive observation. We detect and record who accesses each room and cabinet, ensuring unparalleled protection against tampering.
A Comprehensive 6 tier security perimeter access system is employed to control entry / exit (Parking Lot, Outside Parameter, Building, common area, Operations , Data Center (per Tier 4 Standards))
Fire Protection
Cyber Development Group Fire Protection Infrastructure is based on a three-step process: fire prevention, fire detection, and fire suppression.
Fire Prevention
All Data Center Facilities have 24*7 real-time monitoring for amperage usage and BTU output to reduce the risk of power surge, heat overload and corresponding electrical fires in the data center.
Prohibitions on flammable materials are strictly enforced.
Fire Detection
A Very Early Smoke Detection Alarm (VESDA) system for the detection of smoke and fire is employed throughout the facility.
Real-time NOC monitoring of the VESDA system with direct interconnect to master fire alarm control panel.
Fire Suppression
A facility wide multi-zone Sapphire / FM-200 (non-toxic gas) system with a dry pipe, double interlock pre-action fire sprinkler system as defined by the National Fire Protection Agency (NFPA) shall be installed throughout the data center facilities
The fire suppression system works in conjunction with the VESDA system in all data center facilities.
Dry-Chemical fire extinguishers are also located throughout the facility.
Network Operations Center (NOC)
Cyber Development Group’s Network Operations Center (NOC) operates 24x7 with a full contingent of highly trained engineers and technicians.
The NOC is the focal point of all monitoring, problem tracking, remote management and problem resolution in supporting InteleNet's Managed Hosting clients.
Cyber Development Group NOC uses a real-time trouble ticket management system that keeps the customer informed on a real-time basis and is able to dispatch the correct resource, whether it be Cyber Development Group personnel, customer personnel or even third party providers, to ensure a speedy resolution to every issue.
The NOC receives all incoming operations calls for faults and issues detected by the customer as well as requests for additional services.
The NOC ensures that our customers are always informed, in control, and receiving the best services available in the industry
MEET- ME Room / Tier 1 Carrier Fiber Access
Cyber Development Group’s carrier-neutral architecture provides access to a large number of Tier 1 local access, Internet, long-haul, wireless and next-gen carriers to meet all connectivity needs.
Multiple / Route Diverse Tier 1 Carrier Fiber Rings supporting 10Gb Ethernet and /or OC192 SONET distribution (AboveNet, ATT / SBC, Looking Glass Networks, MCI / UUNET /Verizon, QWEST, SPRINT)
ATT Designated LEVEL 7 (100%) Network Route Diverse compliant
North Fiber Routes bypass downtown Chicago Network Access Points for geographical survivability
Complete Dark Fiber Ring (per AboveNet) with network demarcation points located at 810 Jorie Blvd – Oak Brook and 600 S. federal – Chicago. [Tested to support 10gb Ethernet per StarLight Standards]
Managed 10 GbE connection to 350 East Cermak – Chicago, IL
Three (3) route diverse conduit entrances into separate IDF facilities supported by building internal distribution ring to two(2) separate MDF / NETPOP / Meet Me Room