| Type |
Cost |
| For 2.0 – 6.0 kW of 2N VAC infrastructure |
Call for a custom quote |
| For 6.1 – 10.0 kW of 2N VAC infrastructure |
" |
| For 10.1 – 14.0 kW of 2N VAC infrastructure |
" |
| For 14.1 – 18.0 kW of 2N VAC infrastructure |
" |
| Energy Cost includes
- All critical electrical load to the circuit with 2N circuits (“A” and “B”)
- All cooling / HVAC and related MEP / UPS / FP to support rack systems
- All MEP / FP / UPS / PDU / CRAC maintenance, upgrade, replacement, service
- 24 * 7 * 365 MEP/FP/UPS/PDU Network Operations Center Monitoring
- 24 * 7 * 365 IP-Based Circuit Monitoring and Remote Activation / Deactivation Capability
|